Monk Bridge Road recently underwent surface dressing. This is not an alternative to a full road resurfacing, but is preventative work to slow down damage to the road. We've shared a leaflet below, explaining this. We have asked that the road linings including the pedestrian crossing are reinstated as soon as possible.
As well as this, the Meanwood junction works are underway. This is quite disruptive so we are keen that it is completed as soon as possible! Some issues have been raised with us and we'll be discussing these with local transport officers on site.
If you want to report anything directly please do. You can contact the transport team on james.chadwick@leeds.gov.uk